Pages

Wednesday, September 18, 2013

Epoxy and interior rub rails

Productive evening. Rub rails are curing now with epoxy as well as a thin coat on the interior of the boat. If they are ready in 24 hours, the belt sander will be in use to shape them. 

The next steps are:
1. Sand interior rub rails
2. Cut and fit angled bulkhead pieces. 
3. Epoxy and fillit to attach them to the boat. 
4. Bulkhead covers cut and epoxied along with a second coat for the interior. 
5. Glass and epoxy the exterior. (Possibly by Sunday)
6. Cut and install the exterior rub rails. 
7. Varnish the exterior.
8. Varnish the interior.
9. Water test and seat height and location placement. 
10. Install seat and gear tie downs.

No comments:

Post a Comment