Rob was coating a layer of epoxy on the inside of the hull as I finished cutting the foam bulkheads for the hull. After completing the bulkheads, I started cutting out the skeleton pieces for each of the spots. I have 7 more to go.
What are you looking at? The skeleton pieces will be mounted between 2/4s to keep them vertical as you see. The heights will be adjusted before mounting. Instead of building a workspace on a non-level surface, I have decided to create a level surface by adjusting the height of each skeleton to a level line. The driveway is crowned halfway back. These pieces will solve both problems. The boat shape is cut in each on a line corresponding to the waterline for the hull.
No comments:
Post a Comment