Thursday, I had one stabilizer side plotted and cut with room left over for the scarf joint. I then traced those for three copies and cuts. I then got the bulkheads cut from the foam.
I scarfed them on Friday with Tim weilding the belt sander for two joints as well.
Sunday is supposed to warm up above 60*F which will help the scarfs set up with epoxy.
I scarfed them on Friday with Tim weilding the belt sander for two joints as well.
Sunday is supposed to warm up above 60*F which will help the scarfs set up with epoxy.
No comments:
Post a Comment