The OSB work surface is glued to the floor, half meters marked, centerline snapped and marked, and the first few ribs are installed. The first and last rib is placed according to the previous surveying measurements that we made. The 4.0 meter rib is installed as a reference point, but will need to be adjusted later.
Tomorrow, I will run a reference string on each side of the top of the ribs. I will then base all of the other heights off of that plane.
Quick work as we move forward.